Home solar panel installation in Central Florida. Custom design, professional installation, full permitting. Call AllSolar Energy for a free estimate.
Installing solar panels on your home is a significant project that requires a contractor you can trust to do it right. You need someone who knows local building codes, permitting, and how to work with your specific roof and electrical setup.
AllSolar Energy manages your entire home solar installation from start to finish. We design a system that works for your home's layout and energy profile, handle all permits and approvals, install the panels professionally, and manage final inspection. We've been serving Central Florida and surrounding counties since 1999 with licensed, insured installation work.
Read reviews from homeowners in your community who've had systems installed by our team. We offer free estimates and a clear process. Contact us to get started.
Solar installation includes mounting the panels securely to your roof, running electrical wire through conduit, installing the inverter to convert power, connecting to your electrical panel, and setting up any monitoring equipment. We also install safety disconnects and grounding. Every component is sized and placed to meet electrical code and maximize performance. Poor installation leads to fires, early failures, and calls to the fire department, so we follow code on every detail.
The number of panels depends on your power needs and available roof space. Roof complexity affects how long installation takes. Equipment choices, permit costs, and whether you need an electrical panel upgrade all impact the total. AllSolar quotes honestly based on your actual roof and situation, not inflated estimates.
We start with a free site visit to design the system and handle all permits. Design and permitting can take two to four weeks depending on your local building department. Installation itself takes one to three days depending on system size and roof complexity. After installation, inspection and utility approval follow. Most customers go live within four to eight weeks from the initial visit.
Call or send the form and we'll take a look — usually same week.
The installation itself usually takes one to three days, depending on system size and roof complexity. Before that, design and permits take two to four weeks. After installation, the building inspector schedules an inspection, then the utility company approves the system. Most customers start using solar power within four to eight weeks of their first visit.
Yes, solar panels can be installed on metal roofs. The mounting hardware is different than for shingle roofs, but it works well. AllSolar can assess your metal roof during a free site visit and confirm if installation is feasible.
Poor solar installation causes roof leaks, electrical fires, and early system failure. Panels might fall off, water intrusion can rot the roof, and improper grounding causes shock hazards. AllSolar follows electrical code and building code on every job to avoid these problems.
Yes, AllSolar handles all building, electrical, and solar permits as part of the installation. We submit the paperwork, schedule inspections, and coordinate with your local building department and utility company so you don't have to.
Tell us what you are dealing with and we will come look at it. Free estimates, and a licensed and insured crew doing the work.
Get a free estimateA free Solar Home account keeps your panels, inverter, batteries, pool heater or water heater on record: models, serial numbers, photographs of the labels, warranties, utility and interconnection documents, and every AllSolar service visit attached to your property.
Free to read first, no account needed: the Solar Home guides explain how to identify your equipment, what your production figures mean and what the common warnings are telling you.